Most stand problems start before the stand is built. They start on the first call, when an exhibitor picks the builder with the lowest quotation or the nicest render and finds out three weeks before the show what was not included.
This checklist gives you ten questions to ask any exhibition stand builder, what a good answer sounds like and what should make you pause. You can use it for a stand in India or abroad, and you can use it to compare two or three builders side by side.
How to use this page
Ask each builder the same ten questions in writing, note the answers in one table and compare. The builder who answers clearly and in detail is usually the one who will also work clearly during the build.
The 10 questions to ask
1. What exactly is included in the quotation?
Ask for a line-by-line scope: structure, flooring, graphics, furniture, lighting, electricals, transport, installation and dismantling. Then ask what is not included. A short quotation with one lump sum is hard to compare and easy to dispute later. Our guide to stand costs shows what usually sits inside the price.
2. Will I see the stand in 3D before it is built?
A good builder shares layouts and 3D views from the aisle and from above, and revises them until you approve. Ask how many revision rounds are included. Look at what a 3D design process should show you before you pay for fabrication.
3. Will you read the exhibitor manual?
Height limits, open sides, electrical load and rigging rules differ from show to show. The right answer is yes, and the builder should be able to tell you which rules affect your stand. If the answer is vague, expect a surprise on build-up day.
4. Where is the stand built, and who checks it?
Ask whether the stand is made in the builder’s own facility or outsourced, and whether it is assembled once before dispatch. A pre-assembly saves hours at the venue. See how our own fabrication works before a stand ships.

5. Who supervises the installation?
You want a named supervisor at the venue, not only a labour team. Ask who will be on site, how many people, and what happens if the hall opens late or a rule changes. Read what proper installation and dismantling includes.
6. Can I see work similar to my stand?
Ask for projects of a similar size and type, in a similar kind of show. Our projects page is an example of what you should be able to ask any builder for. Be careful with photos that are renders, not built stands, and ask which is which.
7. How are changes and delays handled?
Stands change. Logos arrive late, a hall plan is updated, a show moves its dates. Ask how change requests are priced and approved, and who your single contact is when something goes wrong.
8. What is the payment schedule?
A normal schedule links payments to stages, such as design approval, start of fabrication and dispatch. Be wary of a request for the full amount before any design is approved.
9. Do you handle shipping and customs for overseas shows?
For shows abroad, ask who plans crating, freight, customs paperwork and the return of materials. Our guide to the costs beyond the stand explains why this matters for your budget.
10. What happens after the show?
Ask who dismantles, who clears the material and whether the stand, or parts of it, can be stored or reused. If you plan to exhibit again, a reusable modular design may change the whole decision.
Good answer or red flag?
| Question | A good answer sounds like | Pause if you hear |
|---|---|---|
| Quotation scope | A line-by-line list with inclusions and exclusions | One lump sum, “everything included” |
| 3D design | Layouts, aisle views and set revision rounds | Only one render, no revisions |
| Exhibitor manual | “We will read it and check height, load and rigging” | “That is not a problem” |
| Build location | Own facility, pre-assembly before dispatch | Cannot say where it is built |
| Site supervision | A named supervisor on site | “Our labour will manage” |
| Payments | Linked to stages after design approval | Full payment before design |
A simple scoring method
Give each builder 0, 1 or 2 points on each question. Anything under 14 out of 20 deserves a second conversation before you sign.
Three more things worth checking
- Response time: how quickly and clearly they answer you before you hire them is a fair preview of the build period.
- Who you will actually deal with: ask to speak to the project manager, not only the sales contact.
- Empanelment and references: ask for organisers or clients who can confirm past work. See our page on stand contractors for what to expect.

Frequently asked questions
How many builders should I compare?
Two or three is usually enough. More than that makes comparison harder, and the quotations are rarely like for like.
Should I choose the lowest quotation?
Compare scope first. A lower price that leaves out lighting, graphics or installation is often higher once those lines are added.
When should I contact a builder?
As early as the stand booking is confirmed. Early contact leaves time for design revisions and for reading the exhibitor manual.
What should I send a builder to get a useful quotation?
The show name, hall and stand number, size, open sides, logo files, products to display and a rough budget range.
Planning your next show?
Send us the show name, stand size and dates and we will reply with a custom quote within 24 hours.
Get a custom stand design for your next show
Share the show, stand size and budget. We reply within 24 hours.
